Engineering & Construction

Growing green

Rain garden outside Wright State's new Student Success Center cultivates sustainability
Growing green

The rain garden outside Wright State’s new Student Success Center highlighting university’s commitment to sustainability. Continue reading

Class act

Wright State’s new Student Success Center expected to inspire, boost achievement
Class act

Wright State’s new Student Success Center features high-tech, active-learning classrooms, writing and math support labs and an outdoor rain garden that underscores the building’s environmental embrace. Continue reading

Students document CAC construction in new Stein Galleries exhibit

Linoleum relief

Current exhibitions at the Stein Galleries feature student artwork documenting the CAC construction project and paintings and drawings by artist Deborah Kahn. Continue reading

Paving the way

Craftsmanship of Wright State’s Sung Kim keeps campus walkways safe, beautiful
Paving the way

Replacing up to 60 pavers a day, Sung Kim, a grounds maintenance worker at Wright State, keeps walkways on the university’s campus safe and beautiful. Continue reading

Heavy build

Flurry of construction projects gives Wright State’s campus a new look
Neuroscience Engineering Collaboration Building exterior

A flurry of construction projects, including the new Neuroscience Engineering Collaboration Building and the Student Success Center, gives Wright State’s Dayton Campus a new look. Continue reading

Wright State University’s dazzling new Neuroscience Engineering Collaboration Building a research powerhouse

Neuroscience Engineering Collaboration Building exterior

Wright State will celebrate the opening on the Neuroscience Engineering Collaboration Building with a ceremony April 16 from 4 to 6 p.m. Continue reading


Architectural features of new Neuroscience Engineering Collaboration Building hit the mark
NEC Building glass fins

Chilled ceiling beam, anti-vibration floor and a glass facade stripped with energy-saving fins are among the many architectural highlights of Wright State’s new Neuroscience Engineering Collaboration Building. Continue reading

Defining military friendly: Wright State opens new Veteran and Military Center

The rock facade of the Veteran and Military Center will feature five bronze medallions — one for each of the five branches of the U.S. armed services.

Designed to be service friendly and support driven, but provide space that’s hands-off and separate from the general population and VMC administration, the new center has a wow factor that’s off the charts. Continue reading

Electrical performance: Wright State installing four vehicle-charging stations

Jim Halderman, left, and Scott Moniaci, associate director of engineering and construction, stand next to the charging-station site outside Allyn Hall.

Wright State University is installing four vehicle-charging stations in prime parking locations for drivers of electric cars and plug-in hybrids. Continue reading